
Hardwood floor installation in Colorado Springs
Solid and engineered hardwood, laid by a family crew with 30 years in the flooring trade. A new floor, a whole house, or more of the floor you already love.

What goes down
Solid, engineered and patterned.
Solid hardwood is one piece of wood top to bottom, so it can be sanded and refinished many times over its life. Oak is the workhorse, with maple and walnut when you want a lighter or a richer floor.
Engineered hardwood is built in layers, which keeps it steadier where moisture moves, like basements and concrete slabs. When the floor should be the feature, we lay patterns too, herringbone included.
Red oakWhite oakMapleWalnutEngineered plankWide plankHerringboneStair treads

Adding on
More of the floor you already have.
Opening a wall, finishing a room, or carrying wood into a hall that had carpet? New boards get woven into the old ones in staggered lengths. Then the whole area is sanded and finished together, so there is no line where old meets new.
“He does incredible work and matched our old floors perfectly.”
Front Range air
Ready for life at 6,035 feet.
Colorado Springs air is thin and dry most of the year, and wood shrinks and swells with it. Letting boards acclimate in the house before they go down, and leaving expansion space at every wall, keeps winter gaps small and the floor flat through summer.
Start to finish
How an install runs.
- 01
Measure and estimate
We look at the rooms, check the subfloor and price the job. The estimate is free.
- 02
Pick the floor
Species, width, stain and sheen. Buy through us or bring your own material.
- 03
Prep
Old flooring comes up and the subfloor gets repaired and leveled where it needs it.
- 04
Install
Most installs take three to seven days, depending on the size of the area and the wood.
- 05
Final walkthrough
We walk the finished floor with you before the job is called done.
From the job site
Recent work.




FAQ
Questions people ask.
How long does a hardwood install take?
It depends on the size of the area and the type of hardwood you choose. On average an install takes between three and seven days.
Solid or engineered hardwood?
Solid hardwood is a single piece of wood and can be sanded and refinished many times. Engineered hardwood is layered, which makes it more stable and more resistant to moisture, so it suits basements, slabs and other spots where solid wood struggles.
Can you match the floor I already have?
In most cases. We match the species and board width, lace new boards into the old, then sand and stain everything together so it reads as a single floor.
Service areas
Hardwood installation around Colorado Springs.
Services
Other floor work we do.
Sanding & RefinishingScratched, gray or sun faded wood sanded to bare and finished in three coats.
Hardwood Stairs & TreadsTreads, risers and nosing matched to the floor at the top and bottom.
LVP & LaminateWater resistant plank for kitchens, baths, basements, laundry rooms and rentals.
Floor Repair & SubfloorWater damaged boards and subfloor replaced, new wood laced in to match.
Free estimates, seven days a week.
Open 8 AM to 6 PM, every day. The owner comes out to measure and walks the job with you.